This 6-level cast-in-place parking structure was built by Ceco Concrete Construction, a nationwide design-assist structural concrete contractor. The entire first level CSH was over 20 feet to allow for a Bus Transfer Station. Ceco provided all horizontal and vertical formwork and placement, and worked successfully in close proximity to high voltage Metrolink tracks.