Ceco Concrete Construction built this 10-story concrete patient tower using a mild-reinforced wide module structural system to increase rigidity and cut costs. Ceco provided concrete formwork, meeting and even exceeding a very difficult schedule on a project with changing clear story heights and floor designs.