close
close
close
sidebar:
Compare Colors

Hayden Ferry Lakeside – Phases 1-3

MULTI-STORY CONCRETE OFFICE BUILDINGS WITH SUBTERRANEAN PARKING

Tempe, Arizona

These two concrete office buildings were built by Ceco Concrete Construction, a nationwide design-assist structural concrete formwork and frame contractor. Phase 1 of this project was completed in 2002, Phase 2 in 2006, and Phase 3 in 2015.

Back to top