This 10-story hotel in Richmond Heights Missouri was built by Ceco Concrete Construction, a nationwide design-assist structural concrete contractor. Ceco’s in-house engineering team laid out separate edge form locations in each bay to mediate offsets in the building’s perimeter edge. This project was completed on time and within budget.