close
close
close
  • Radisson Blu Hotel – MOA

    Ceco Concrete

    Radisson Blu Hotel – MOA

    13-STORY HOTEL Bloomington, Minnesota This 13-story hotel was built by Ceco Concrete Construction, a nationwide design-assist structural concrete formwork and frame contractor.

  • Frito Lay Distribution Center

    Ceco Concrete

    Frito Lay Distribution Center

    TILT-UP WAREHOUSE AND DISTRIBUTION FACILITY Honolulu, Hawaii Tilt-up warehouse and distribution facility for Frito Lay in Hawaii. High end architectural panels were tilted in 3 days.

  • Palos Community Hospital

    Ceco Concrete

    Palos Community Hospital

    8-STORY CONCRETE ACUTE CARE HOSPITAL BED TOWER Palos Heights, Illinois Ceco Concrete Construction, LLC, a nationwide design-assist structural concrete contractor, completed this 8-level concrete acute care hospital tower using the wide module structural...

  • Clay Commons Parking Garage

    Ceco Concrete

    Clay Commons Parking Garage

    7-LEVEL, 350-CAR PARKING STRUCTURE DOWNTOWN LOUISVILLE Louisville, Kentucky Ceco provided the full turnkey frame scope of work for this high profile 7-level, 350-car parking structure located adjacent to the historic Henry Clay Building in downtown...

  • University of Oregon East Residence Hall

    Ceco Concrete

    University of Oregon East Residence Hall

    4-STORY CONCRETE STUDENT HOUSING BUILDING Eugene, Oregon This 4-story concrete student housing building was built by Ceco Concrete Construction, a nationwide design-assist structural concrete formwork and frame contractor. Ceco employed a 2-way flat...

  • Marlins Site Parking Garages

    Ceco Concrete

    Marlins Site Parking Garages

    PARKING GARAGES FOR MIAMI MARLINS STADIUM Miami, Florida These parking garages for the Miami Marlins stadium were built by Ceco Concrete Construction – a nationwide structural concrete contractor.

  • San Diego Central Library

    Ceco Concrete

    San Diego Central Library

    14-STORY PUBLIC CONCRETE LIBRARY FOR THE CITY OF SAN DIEGO, CA San Diego, California This 14-story concrete library was built for the City of San Diego by Ceco Concrete Construction, a nationwide design-assist structural concrete formwork and frame...

  • SDCCD City College Science & Technology Building

    Ceco Concrete

    SDCCD City College Science & Technology Building

    4-LEVEL CONCRETE CLASSROOM AND LAB BUILDING San Diego, California This 4-level concrete classroom and lab building was built by Ceco Concrete Construction, a nationwide design-assist structural concrete formwork and frame contractor, for the San Diego...

  • University of Arizona North End Zone Expansion

    Ceco Concrete

    University of Arizona North End Zone Expansion

    4-LEVEL CONCRETE STADIUM END ZONE EXPANSION Tucson, Arizona This 4-level concrete stadium expansion was built by Ceco Concrete Construction, a nationwide design-assist structural concrete contractor. Ceco utilized the wide module structural system to...

  • Nucleus Innovation Park

    Ceco Concrete

    Nucleus Innovation Park

    8-STORY RESEARCH CENTER Louisville, Kentucky The Nucleus Innovation Park was built by Ceco Concrete Construction Cincinnati office using 20″ by 66″ wide module structural system to increase rigidity and prevent deflection. The vibration...

  • Marriott Residence Inn

    Ceco Concrete

    Marriott Residence Inn

    11-STORY CONCRETE HOTEL TOWER Tempe, Arizona This 11-story concrete hotel tower was built in the heart of Arizona State University by Ceco Concrete Construction, a nationwide concrete formwork and frame contractor. This project was built on a very tight...

  • Cerner West Campus

    Ceco Concrete

    Cerner West Campus

    TWO 9-STORY WIDE MODULE OFFICE TOWERS Kansas City, Missouri This pair of 9-story wide module office towers for Cerner was built by Ceco Concrete Construction using wide module concrete formwork and structural system to reduce cost and schedule and...

Back to top