close
close
close

Ceco Concrete

ROBINS & MORTON

“We would like to thank Ceco Concrete for the amazing performance they gave to complete the concrete work for South Texas Health System Edinburg RMC. Ceco shortened our original concrete duration and fought through an abnormal amount of rainfall to deliver the structure on time. They accomplished this with no significant injuries and did an outstanding job with quality. The team [General Superintendent Mike Schautteet, Project Superintendent Francisco Urrutia, Project Manager Kenneth Mack, Engineer Floyd Golding, BIM Technician Vincent Casas, Regional Safety Manager David Harris] appeared to be an "A" team from Ceco. We gave Ceco a 100% customer satisfaction rating. It would be our pleasure to work with Ceco again, and we look forward to the experience.”

Dusty Gallas, Lead Project Superintendent; Jeremiah Lagalo, Project Manager

sidebar:
  • Tanner Parking Structure at BYU

    Ceco Concrete

    Tanner Parking Structure at BYU

    3-LEVEL CAST-IN-PLACE PARKING STRUCTURE Salt Lake City, Utah This 3-level cast-in-place concrete parking structure was built by Ceco Concrete Construction, a nationwide design-assist structural...

  • Texas Children's Hospital

    Ceco Concrete

    Texas Children's Hospital

    21-STORY WIDE MODULE CONCRETE ACUTE CARE HOSPITAL BED TOWER Houston, Texas Ceco Concrete Construction, a nationwide design-assist structural concrete formwork and frame contractor, worked with the...

  • The 360 Rosemary

    Ceco Concrete

    The 360 Rosemary

    30-STORY POST-TENSIONED CONCRETE OFFICE BUILDING West Palm Beach, Florida Featuring panoramic views of West Palm Beach, The 360 Rosemary—also known as “The 360”—is one of the...

  • The Bristol

    Ceco Concrete

    The Bristol

    25-STORY WATERFRONT CONDOMINIUM TOWER West Palm Beach, Florida Located in West Palm Beach, FL, the design for The Bristol was inspired by the image of a yacht sailing along the water and its ensuing...

  • The Collective at Tucson – Main Gate

    Ceco Concrete

    The Collective at Tucson – Main Gate

    15-STORY POST-TENSIONED CONCRETE RESIDENTIAL TOWER Tucson, Arizona The Collective Apartments at Main Gate is a 15-story, two-winged apartment tower within walking distance of the University of...

  • The Collegiate

    Ceco Concrete

    The Collegiate

    Construction is wrapping up at The Collegiate, a #CecoConcrete project located in Lincoln, NE for Hausmann Construction. This project features two 13-level free-standing core walls. This project is...

  • The Continental

    Ceco Concrete

    The Continental

    We are wrapping up construction at The Continental in Madison, WI, a 12-story residential building including 2 levels of below grade parking. #CecoConcrete provided deck formwork services on this...

  • The Hub Student Housing Tower

    Ceco Concrete

    The Hub Student Housing Tower

    20-STORY CONCRETE STUDENT HOUSING TOWER Tempe, Arizona This 20-story concrete student housing tower overlooking Sun Devil Stadium was built by Ceco Concrete Construction, a nationwide concrete...

  • The Larking

    Ceco Concrete

    The Larking

    MIXED-USE REDEVELOPMENT: 3 LEVELS UNDERGROUND PARKING, STREET-LEVEL RETAIL/BANK, 15 LEVELS RESIDENTIAL SPACE Minneapolis, Minnesota The Larking redevelopment is transforming the site of a...

  • The Link at Uptown

    Ceco Concrete

    The Link at Uptown

    Dallas, Texas The Link at Uptown is a 24-story, Class AA office building that connects the Uptown neighborhood of Dallas to two vibrant areas: Victory Park and downtown Dallas. The structure is a...

  • The Metropolis Lofts & Flats

    Ceco Concrete

    The Metropolis Lofts & Flats

    20-STORY CONCRETE CONDOMINIUM TOWER Las Vegas, Nevada This 20-story concrete condominium tower was built by Ceco Concrete Construction – a nationwide design-assist structural concrete formwork...

Back to top